Potholes, Flooding, Blocked culvert, Ice.
Reported via desktop in the Surface Condition category anonymously at 14:21, Thursday 30 January 2025
Sent to Northumberland County Council less than a minute later. FixMyStreet ref: 7059436.
Approximately 50m of road with numerous potholes. Under road culvert blocked and east ditch floods the road concealing potholes. Flood water freezes and road becomes an ice rink. Regular pothole repair negated by washing action of surface water and freezing action. Ditches and culvert need to be reinstated. Road much busier whilst the Whitfield/Allendale has long term closure.
This report is now closed to updates from the public. You can make a new report in the same location.
Updates
-
Thank you for your report. We will review this report within 10 working days. If you do have photographs please upload them to the report. This will assist us in our response.
Posted by Northumberland County Council at 14:21, Thursday 30 January 2025
-
Works have been instructed in this area.
State changed to: Action scheduled
Posted by Northumberland County Council at 12:33, Friday 31 January 2025
-
Great news, we have an update.
We've completed our investigation and works are now planned. We aim to complete repairs within 28 working days.
Posted by Northumberland County Council at 13:00, Friday 31 January 2025
-
This report has now been closed. All necessary actions have been taken to resolve this issue. Thank you on behalf of Northumberland County Council.
State changed to: Fixed
Posted by Northumberland County Council at 11:50, Wednesday 5 February 2025
-
Not Fixed. The potholes at the time were filled but this only addressed the symptom. The ditch to the east of the road is blocked and overgrown for about 50m. As a result all storm water from the ditch location flows onto the road. The repairers dug a couple of escape channels on the west of the road to release accumulated water. However the storm water still floods the road and does not disperse before freezing over. The east site ditch needs to be reinstated and the under-road culvert at the lowest point needs to be unblocked to allow full flow. As shown on the map this is the underpass for the Gatehouse Burn. This not hand dig solution, it requires an hours work by a mechanical excavator. Already new potholes have occurred by the constant presence of water and the washing action of traffic. This has recently become worse as there has been significantly more traffic because of the long term closure of the Whitfield to Allendale Road.
State changed to: Open
Posted anonymously at 15:26, Thursday 27 February 2025
Still open, via questionnaire -
Works have been instructed in this area.
State changed to: Action scheduled
Posted by Northumberland County Council at 12:27, Friday 28 February 2025
-
The ditch and culvert have not been re-instated.
Posted anonymously at 16:17, Thursday 27 March 2025
Still open, via questionnaire -
Great news, we have an update.
We've completed our investigation and works are now planned. We aim to complete repairs within 28 working days.
Posted by Northumberland County Council at 16:17, Thursday 27 March 2025
-
This report has now been closed. All necessary actions have been taken to resolve this issue. Thank you on behalf of Northumberland County Council.
State changed to: Fixed
Posted by Northumberland County Council at 11:41, Tuesday 1 April 2025