You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

4-Storm drains on U2038 blocked & damaged.

Reported via desktop in the Blocked - Flooding of Road/Path category anonymously at 07:23, Tuesday 24 September 2024

Sent to Northumberland County Council less than a minute later. FixMyStreet ref: 6507490.

Their are 4-storm drains...sorry only 3-photos. I have volunteered to keep these clear & cut the verges for the past 30-years but I am unable to raise the grates to remove the debris. They are full of waste. They have not been cleared out for many years. Can the damage be repaired & the drains cleaned out before the heavy rains come...? I do not know if their are more than 4-drains on this stretch...how do I find out if their are more...? Thank you.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for contacting us about an issue with a drain.

    Our inspection teams will review your report within 10 working days.

    We will investigate drain reports that relate to the following:-

    • Where cars are having to drive on the opposite side of the road due to a blocked drain
    • Where pedestrians are having to walk off the pavement into the road due to a blocked drain
    • Where the road is not passable due to blocked drains
    • Where surface water from the highway is entering business premises
    • Where surface water from the highway is entering private property
    • Where there is a build-up of surface water at a bus stop
    • Where there is a build-up of surface water at pedestrian crossings

    Below are some examples of blocked drains:

    blocked drains

    Posted by Northumberland County Council at 07:23, Tuesday 24 September 2024

  • State changed to: Investigating

    Updated by Northumberland County Council at 12:45, Tuesday 24 September 2024

  • State changed to: Action scheduled

    Updated by Northumberland County Council at 12:46, Tuesday 24 September 2024

  • Great news, we have progress on your report.

    Our inspection team have completed their investigations and instructed repairs to be completed. At this time the repair does not meet our immediate repair criteria.

    We have added this repair to our future schedule of works.

    Posted by Northumberland County Council at 12:46, Tuesday 24 September 2024

  • State changed to: Fixed

    Updated by Northumberland County Council at 14:16, Tuesday 15 October 2024

  • Great news, we are pleased to tell you your report has now been resolved.

    Thank you for helping us fix this.

    Posted by Northumberland County Council at 14:16, Tuesday 15 October 2024

  • Still open, via questionnaire, 08:18, Tuesday 22 October 2024

Only the original reporter may leave updates. If you made the original report please log in to leave an update.